Elevator installation branch project completion acceptance reference procedure
1. During the completion acceptance, all parties involved in the construction (including the project leader and professional personnel in charge of the construction unit, the director of the supervision unit and the elevator supervision engineer, the project manager of the construction unit and the relevant personnel of the quality department) shall be present。
2. The team leader of the acceptance team (the construction party is the team leader) presides over the completion acceptance。
3. The leader of the acceptance group introduces the personnel of the acceptance group。
4, the construction unit to introduce the project overview and completion。
5, the construction and supervision units shall report respectively the performance of the elevator installation branch project contract and the implementation of laws, regulations and mandatory standards in all aspects of the project construction。
6, the acceptance team personnel respectively check the elevator installation branch project completion data and project physical quality。
7, the acceptance team personnel respectively report the inspection situation and form the preliminary acceptance opinions of the elevator installation branch project。
8, listen to the quality supervision body on the entire elevator installation branch project preliminary acceptance opinions and make corresponding adjustments, the formation of a formal elevator installation branch project completion acceptance opinions (when the construction parties do not agree, should negotiate to put forward solutions。After consensus, re-organize the elevator installation branch project completion acceptance)。
9. The leader of the acceptance team announces the completion acceptance meeting is over。
10. Summarize the archival information of the elevator installation project and enter the archival procedure。
keyword:Hunan elevator project
Article source: http://www.alexblog.net/
Previous page:Hunan elevator exactly how to choose?
Key words: Elevator engineering Hunan elevator project
Related articles:
Elevator engineering construction requirements 1, electric drive traction or forced elevator construction requirements 1.Elevator equipment approach acceptance (1) Equipment approach inspection...
Safety management is the management of people, things and environmental factors in production, effectively controlling the insecure behavior of people and the insecure state of things, and avoiding accidents...
Question 1 about some elevators.Purpose and significance of elevator maintenance Elevator maintenance refers to the regular inspection, refueling and removal of dust accumulation of the operating elevator components...
Elevator as an important building special equipment, the total assembly is completed in the construction site, elevator installation quality is crucial to improve the overall quality of the project...