In order to ensure电梯The equipment is good, to provide quality service, we must pay attention to the elevator equipment for standardized management, the main content of equipment management are: elevator acceptance, maintenance management and technical file management。
Take over the importance of acceptance
The acceptance work is an important process from the installation of equipment to the use of people, holding this pass is of great significance to the future management and use, so each elevator should be inspected individually。
Takeover acceptance procedure
The take-over acceptance procedure is usually divided into two stages: ****** the first acceptance is the initial inspection. The problems found should be resolved by agreement and the time for reinspection should be determined;The second acceptance shall be reinspection, and the failed reinspection shall be resolved within a limited time limit。The lack of land and the problem that does not affect the use of the equipment can be used as a legacy problem and the construction unit can sign an agreement for warranty or compensation。
Acceptance standards and regulations
The specific technical standards for acceptance shall be governed by the current norms and standards of ******。The main technical specifications are as follows:(1) The mechanical part of the installation quality shall comply with TJ231 (IV) -78 "Mechanical Equipment installation Engineering construction and acceptance Code; (2) The electrical part shall comply with the relevant provisions of GBJ232-82" Electrical equipment installation Engineering Construction Acceptance Code ";(3) The manufacturing quality of the product should comply with the provisions of GB7588-87 "Elevator Manufacturing and Installation safety Code", the construction part of Wo should comply with JB1435-74 elevator and its shaft room type,Basic parameters and dimensions"。
The key inspection parts and basic requirements of acceptance application
In order to ensure the quality of elevator equipment, the following key parts should be paid attention to during acceptance inspection: (1) the tractor runs smoothly, the vibration and noise do not exceed the standard, and the oil tank element leakage。(2) the deviation between the track gauge and the verticality does not exceed the standard;(3) The tension of the wire rope should be balanced and the car running smoothly and leveling accurately,Door opening noise does not exceed the standard;(5) Each part of the safety device, 朂 the main is the door lock, speed limit, limit and limit switch need to be sensitive, accurate and reliable;(6) The electrical device is well grounded and the insulation is qualified;(7) The height of the machine room, the height of the top layer and the depth of the pit meet the standards, etc。
keyword:Hunan Elevator
Article source: http://www.alexblog.net/
Previous page:Do you understand the acceptance procedure of Hunan elevator project?
Next page:Elevator science!
Key words: 电梯 Hunan Elevator
Related articles:
Elevator engineering construction requirements 1, electric drive traction or forced elevator construction requirements 1.Elevator equipment approach acceptance (1) Equipment approach inspection...
Safety management is the management of people, things and environmental factors in production, effectively controlling the insecure behavior of people and the insecure state of things, and avoiding accidents...
Question 1 about some elevators.Purpose and significance of elevator maintenance Elevator maintenance refers to the regular inspection, refueling and removal of dust accumulation of the operating elevator components...
Elevator as an important building special equipment, the total assembly is completed in the construction site, elevator installation quality is crucial to improve the overall quality of the project...